TCI Strategic Plan Documents
The Concept of Operations describes the manner in which transportation stakeholders in DuPage County interact to provide transportation services, and how ITS tools can be applied to improve these services. This document also contains the stakeholder Needs Assessment.
The DuPage County Subregional ITS Architecture provides a framework for describing, planning, and implementing ITS, that promotes coordination between stakeholders. For a list of TCI stakeholders and other information, see the TCI Architecture Appendices.
The Integration Strategies and Technologies document evaluates potential solutions to the TCI needs indentified in previous steps.
The TCI Implementation Plan identifies ITS projects that provide the basis for planning, deployment, operation, and maintenance of ITS in DuPage County for the next ten years.
A Traffic Incident Management (TIM) Work Group consisting of emergency responders and transportation agency personnel convened twice during the TCI planning process. The DRAFT TIM Work Plan was developed as a basis for any future group activities.
DuPage County ITS Projects
TCI Implimentation Plan reference: Section 4.2.3, Integrated Expressway-Arterial Corridors
Army Trail Road Traffic Signal Coordination and Integration
This project will develop a traffic monitoring system utilizing vehicle detection devices to monitor significant changes in volumes of traffic on Army Trail Road at the I-355 Veterans Memorial Tollway and specific locations west of this interchange. Tollway ramp devices will initiate an alarm at the DuPage County Division of Transportation (DDOT) office and activate a pre-installed timing program in the Aries signal controller software, designed to clear ramps of queued traffic prior to having traffic back up onto the through lanes of the expressway. An additional device located eastbound on Army Trail Road midway between Meadow Lane and Creekside Drive, will alert the DDOT Traffic Engineer of traffic conditions approaching the interchange. Pan-tilt-zoom cameras situated on Army Trail Road at Glen Ellyn Road, and at I-355, will provide the engineer with on-site capabilities to detect and monitor specific occurrences associated with the alarms. Fiber optic cable will be installed between Meadow Lane and Creekside Drive to complete an essential communications link within the project area.
Project Status: Professional Services Contract for Phase II Engineering services approved by DuPage County Board on September 9, 2008.
For more information contact DDOT Traffic Engineer, David Ziesemer, at the Division of Transportation office at (630)407-6900 (M-F 8 a.m. to 4:30 p.m., excluding holidays) or e-mail at david.ziesemer@dupageco.org.
Regional ITS Links
Content Last Updated 8/6/2009 |