2018 Retaining Wall Repairs

Project Letting Details

Letting DateSectionProject
May 8, 201818-RETWL-01-MS

 2018 Retaining Wall Repairs

CH 4 Bloomingdale/Roselle Road
CH 13 Winfield Road
CH 14 Eola Road
CH 29 Stearns Road
CH 35 55TH Street
CH 40 Yackley Avenue

 

 

Status

Let May 8, 2018. Pending Award.

Request for Authorization to Bid

In order to bid on this project, first submit the Authorization to Bid form(PDF)

Advertisement

  • Link to IDOT Contractor's Bulletin which includes projects advertised for Local Public Agencies
  • Bulletin Date: Thursday, April 26, 2018
  • Bulletin Corrections: 1.) The opening sentence in the IDOT bulletin should read "2018 RETAINING WALL REPAIRS AT SIX  
    LOCATIONS..." instead of five locations.   2.) Some of the quantities given in the bulletin have been revised. See description below for
    revised quantities.
  • Description: 2018 RETAINING WALL REPAIRS  AT SIX LOCATIONS INCLUDING TREE REMOV 6-15 – 53 UNIT; TREE REMOV OVER 15 – 50 UNIT; TEMPORARY FENCE – 500 FOOT; TREE TRUNK PROTECTION – 2 EACH; TREE ROOT PRUNING – 3 EACH; TREE PRUN 1-10 – 15 EACH; SUPPLE WATERING – 7 UNIT; EARTH EXCAVATION – 106 CU YD; FURNISHED EXCAVATION – 51 CU YD; TRENCH BACKFILL  - 69 CU YD; TOPSOIL F&P 6 – 630 SQ YD; SODDING, SALT TOLERANT – 630 SQ YD; PERIMETER EROS BAR – 957 FOOT; INLET PIPE & PROTECT – 1 EACH; INLET FILTERS – 5 EACH; STONE RIPRAP CL A3 – 28 SQ YD; AGG BASE CSE B4 – 348 SQ YD; PC CONC SIDEWALK 5 – 2,643 SQ FT; COMB CURB GUTTER REM – 61 FOOT; SIDEWALK REM – 2,643 SQ FT; STRUCTURE EXCAVATION – 590 CU YD; TEMP SHT PILING – 3,184 SQ FT; TEMP SOIL RETEN SYSTM – 1,414 SQ FT; SEG CONC BLOCK WALL – 160 SQ FT; STORM SEW CL A 1 12 – 16 FOOT; STORM SEW CL B 1 10 – 16 FOOT; CONCRETE SEALER – 3,878 SQ FT; CONTR LOW-STRENG MATL – 5 CU YD; MAN TA 4 DIA – 1 EACH; INLETS TA – 2 EACH; VV ADJUST – 1 EACH; GRATES T8 – 1 EACH; FR & GRATES T3V – 1 EACH; FR & GRATES T11V – 1 EACH; FR & LIDS T1 CL – 3 EACH; COMB CC&G TB 6.06 – 301 FOOT; COMB CC&G TB 6.18 – 48 FOOT; COMB CC&G TB 6.18 VWGF – 13 FOOT; SPBGR TY A 9 FT POSTS – 337.5 FOOT; TRAF BAR TERM T2 – 1 EACH; TR BAR TERM T1 SPL TAN – 1 EACH; GUARDRAIL REMOV – 400 FOOT; CHANGEABLE MESSAGE SIGN – 12 WEEK; TERMINAL MARKER-DA – 1 EACH; UNDRGRD C GALVS 2 – 325 FOOT; MAIN EX TR SIG INSTAL – 2 EACH; ELCBL TRACER 14 1C – 620 FOOT; DRILL EX HANDHOLE – 2 EACH; REM ELCBL FR CON – 620 FOOT; REM & RE ELCBL FR CON – 620 FOOT; SEG CONC BLK WALL, SP – 260 SQ FT; CONDUIT SPLICE – 4 EACH; P UNDR FOR STRUCT 4 – 25 FOOT; TEMP TR SIGNAL TIMING – 2 EACH; CONC BLOCK RET WALL – 2,594 SQ FT; TIMBER RET WALL REM & RE – 140 SQ FT; CONSTRUCTION LAYOUT – 1 L SUM; REBUILD EX HANDHOLE – 1 EACH; TRAFFIC CONTROL AND PROTECTION – 1 L SUM; BIT STAB 6 SPBGR – 256 SQ YD; DRAINAGE STR ADJ – 5 EACH; DRAINAGE STR REMOVED – 1 EACH; SS P CUL REMOV – 25 FOOT; RETAINING WALL REMOV – 1,825 SQ FT; TEST HOLE – 6 EACH; REBUILD EX HH TO HD HH – 1 EACH
  • Note: This project is subject to the Prevailing Wage Act (820 ILCS 130)
     

IDOT Prequalification Category Required

Plans, Special Provisions and Bid Details

For-Bid List of Plan Holders

Updated May 7, 2018

  • D Construction, Inc.
    Contact: Everett Leasure
    Email: e.leasure@dconstruction.com
    Phone: 815-634-2555
    Fax: 815-634-8478

  • Alliance Contractors
    Contact: Scott A. Marquart
    Email: estimating@alliancecontractors.com
    Phone: 815-338-5900
    Fax: 815-338-9109

  • Lorig Construction Company

  • Copenhaver Construction, Inc.
    Contact: Kim Bolanowski
    Email: copenhaverKB@gmail.com
    Phone: 847-428-6696x102
    Fax: 847-428-6798

  • Martam Construction, Inc.