Bridge Joint Repairs

Project Locations

  • CH 3 Ferry Road over WB Du Page River
  • CH 53 Diehl Road over WB Du Page River
  • CH 17  Maple Avenue over I-355
  • CH 38   63RD Street over I-355
  • CH 33 75TH Street over I-355

 

Updated October 24, 2017

Short Description of Work

DuPage County is replacing bridge joints at the locations listed above.

Traffic Control

This project will be constructed utilizing long term lane closures during construction stages.

Contract Cost

 $ 419,400.00

Completion Date

Construction is expected to be complete by early October, 2017.

Construction Status

  • Construction expected to begin on week of July 31, 2017
  • Work begun August 3rd on Diehl Road, traffic down to 1 lane in each direction
  • Work begun August 10th on 63RD Street, traffic down to 1 lane in each direction
  • Work completed on Diehl Road on September 1st, all lanes open to traffic.
  • Work on Ferry Road begun on September 6th, traffic down to 1 lane in each direction.
  • Work on 63RD Street completed on September 13th, all lanes open to traffic.
  • Work begun on Maple Avenue on September 13th, traffic down to 1 lane in each direction.
  • Work completed on Ferry Road on September 14th, all lanes open to traffic.
  • Work begun on 75TH Street on September 21st, traffic down to 1 lane in each direction.
  • Nighttime joint repair work completed at Maple Avenue and I-355 on October 18th.
  • Work completed on 75TH Street on October 18th. All lanes opened to traffic.
  • Construction is 100% complete.

    Table caption
    Function/RoleResponsible Party
    Contractor Path Construction
    Arlington Heights,IL 
     (847) 997-9147
    Design Engineer Knight Engineering
    Resident Engineer 

    John Supple (Bollinger, Lach & Associates)
    Itasca, IL 

    Project Engineer Tom Hardy (DuPage County) 
    (630) 407-6900