Main Street - Culvert Lining at 2nd Street

Updated:Wednesday, May 29, 2019

Project Location(s)

County Highway 5     Main Street (Glen Ellyn Road)

Short Description of Work

Two existing large culverts crossing Main Street just north of 2nd Street will be lined to extend their service life.  The existing culverts are corrugated metal pipes.  The existing railing and block wall on the east side of Main Street will be removed and a new railing and concrete headwall will be constructed.  A concrete headwall will also be constructed on the west side of Main Street.

Traffic Control

Lane closures will be required for this work.  Two-way traffic will be maintained.

Contract Cost

$388,623.00

Completion Date

30 Working Days are allowed per the contract.

Construction Status

Work by the contractor has not started.
However, tree removal on the west side of Main Street has been done by DuPage County crews in advance of the construction.

Plans, Special Provisions and Bid Details

Link to plans, special provisions, and bid details.

  

Function/RoleResponsible Party
Contractor

Benchmark Construction
2260 Southwind
Bartlett, IL  60103
(630) 497-1700

Design Engineer

HRGreen, Inc.
McHenry, IL  60050

Resident Engineer

Knight E/A, Inc.
Chicago, IL  60601

Project Engineer

Kent Kuper, P.E.
DuPage County D.O.T.
(630) 407-6900