75th Street at Naper Boulevard

Updated:Friday, September 6, 2019

Project Location(s)

County Highway 33    75th Street
At Naper Boulevard

Short Description of Work

The project includes the installation of a new traffic signal, resurfacing and striping for dual left turn lanes on 75th street, removal of the existing corner islands, and removal and replacement of sidewalk.

Traffic Control

This project will be constructed primarily using daily lane closures.

Contract Cost

$859,093.75

Completion Date

65 Working Days are allowed per the contract.

Construction Status

Work is expected to begin in September.

Plans, Special Provisions and Bid Details

Link to the IDOT (Illinois Department of Transportation) website for plans, special provisions, and addenda.
(Item 138 on the April 26, 2019 letting) 
https://webapps.dot.illinois.gov/WCTB/LbContractDetail/Index/d86d8f4f-0aaf-4573-8246-32cd6cdde4cc?page=2&contractId=45d70e9d-c47a-47b9-bc0f-ab2dae40b98f

 

PSI Report

Function/RoleResponsible Party
Contractor

Home Towne Electric, Inc.
35220 Rt 83
Lake Villa, IL 60046
(847) 223-2800

Resident EngineerKnight E/A, Inc. 
Chicago, IL  60601
Project EngineerSteve Mlynarczyk, P.E. 
DuPage County DOT
(630) 407-6900