skip to main content
The County of DuPage
Wheaton, Illinois
 

New Starts

Statements of Interest (SOI) are currently being requested for the projects listed below.  SOI’s are due by 3:00 PM on the date noted on the schedule.  Click on the Detailed Narrative below for a description of the project, scope of required professional services, prequalification requirements and key personnel requirements.  A separate SOI must be submitted for each project.  SOI’s shall be limited to not more than two (8 ½ X 11) pages and include, at a minimum, the following information:  Name of firm with address and contact information; contact person for the firm; statement indicating firm’s interest in the project; a summary of projects similar in scope and magnitude recently completed by the firm; a list of proposed key staff who would be assigned to the project; and, a list of proposed sub consultants, if any.  

DescriptionDepartmentDetailed Narrative 
Water Efficiency Study (Phase II) FacilitiesManagement View
St. Joseph Creek Watershed Plan (Prelim) Stormwater View
Facility Electrical Infrastructure/Wastewater Treatment Plants (Design) PublicWorks View
Various Structural Engineering DOT View
Greenbrook Blvd. Resurfacing (Construction Eng) DOT View
Geneva Road Bridge over WBDR (Prelim/Design) DOT View
Central Signal System Expansion (Construction Eng) DOT View
55th Street, Dunham to Clarendon Hills (Construction Eng) DOT View

Contact Numbers

For questions or issues regarding your submittal, please contact the appropriate department.

DOT
630-407-6900


Facilities Management
630-407-5700


Public Works
630-407-6800


Stormwater
630-407-6700