Annual Highway Program

2023 Construction Program

This year’s Program incorporates the County's priority to maintain our existing infrastructure while at the same time implementing projects to improve safety and relieve congestion.  In 2023, approximately 71 lane miles of County highways are proposed to be patched and resurfaced to improve rideability and to extend the service life of the existing pavements.  The roadways include: 

  • Army Trail Road from County Farm Road to 84th Court
  • Army Trail Road from Schmale Road to IL 53
  • Wehrli Road/College Road from 75th Street to Maple Avenue
  • Eola Road from I-88 to IL 56 (Butterfield Road)
  • Ferry Road from Eola Road to IL 59
  • Jewell Road from County Farm Road to Gary Avenue
  • Maple Avenue from IL 53 to Belmont Road
  • Midwest Road / Summit Avenue from I-88 to IL 38 (Roosevelt Road)
  • River Road from Ferry Road to Warrenville Road

Other major projects include:

  • Bloomingdale Road over the Canadian National Railroad (bridge replacement)
  • Geneva Road over the West Branch of the DuPage River (bridge replacement)
  • Illinois Prairie Path (Volunteer Bridge) over the Union Pacific Railroad (raise bridge)
  • Lemont Road from 83rd Street to 87th Street (intersection improvements and resurfacing)
  • Naperville Road from Naperville-Wheaton Road / Ridgeland Avenue to Diehl Road (intersection improvements and resurfacing)
  • Warrenville Road over the East Branch DuPage River (bridge replacement)

The 2023 Proposed Construction Program totals $55,250,000 (all fund sources).

To view the 2023 Proposed Construction Program, click on the following link:

DuPage County Roads Currently Under Contract and/or Under Construction

For Additional Information

Call the main office at 630-407-6900 (M-F 8 a.m. to 4:30 p.m.) or click on Project Details link below for more details.

Road Construction
2024 Pavement Maintenance - North Region

Updated: Thursday, May 16, 2023

Project Location(s)

  • CH 7 St. Charles Road - Riford Rd to IL 53
  • CH 54 Swift Road - St. Charles Rd to Collins Ave
  • CH 24 Medinah Rd/Walter Dr/Byron Ave - Army Trail Rd to IL 19 (Irving Park Rd)
  • CH 28 Villa Avenue - IL 64 (North Ave) to US 20 ( Lake St)

Short Description of Work

This project is a part of DuPage Counties yearly pavement maintenance program to resurface multiple roadways and improve ride quality. Work that will be performed includes: curb and sidewalk repairs; drainage repairs;  pavement resurfacing; and new pavement markings.

Traffic Control

The project will be constructed primarily using daily lane closures. 

Contract Cost
$4,483,656.81

Completion Date
September 27, 2024

Construction Status

  • Villa Avenue:
    • Saw cutting in preparation for various curb replacement, drainage repairs and sidewalk replacement work is expected to begin the week of 5/27/24. 
    •  


Plans, Special Provisions and Bid Details

Link to plans, special provisions, and bid details.

Function/Role Responsible Party
Contractor Builders Paving, LLC
4401 Roosevelt Road
Hillside, IL 60162
(847) 419-9000
Resident Engineer Ciorba Group
Project Engineer Keith Warf
DuPage County Division of Transportation
(630) 407-6900
2024 Pavement Maintenance - South Region

Updated: Thursday, May 16, 2024

Project Location(s)

  • CH 13 Winfield Road - Diehl Rd to Warrenville Rd
  • CH 3 Warrenville Road - IL 53 to Finley Rd
  • CH 52 Cross Street - US 34 (Ogden Ave) to Warrenville Rd
  • CH 2 Finley Road - US 34 (Ogden Ave) to IL 56 (Butterfield Rd)
  • CH 25 Meyers Road - IL 56 (Butterfield Rd) tot IL 38 (Roosevelt Rd)

Short Description of Work

This project is a part of DuPage Counties yearly pavement maintenance program to resurface multiple roadways and improve ride quality. Work that will be performed includes: curb and sidewalk repairs; drainage repairs;  pavement resurfacing; and new pavement markings.

Traffic Control

The project will be constructed primarily using daily lane closures.

Contract Cost
$6,975,390.65

Completion Date
September 27, 2024

Construction Status

  • Warrenville Road:
    • Saw cutting in preparation for various curb replacement, drainage repairs and sidewalk replacement work is expected to begin 5/20/24.

Plans, Special Provisions and Bid Details

Link to plans, special provisions, and bid details.

Function/Role Responsible Party
Contractor K-Five Construction Corporation
999 Oakmont Plaza Dr. Ste 200
Westmont, IL 60559
(630) 257-5600
Resident Engineer Primera Engineers
Project Engineer Steve Mlynarczyk, P.E.
DuPage County DOT
(630) 407-6900
87th Street at Woodward Avenue
  • Updated: Thursday, April 11, 2024

    Project Location(s)

    County Highway 31: 87th Street/Boughton Road (from the Costco entrance to east of Havens Drive)

    County Highway 56: Woodward Avenue (from 87th/Boughton to 700' north)

    Woodward Avenue (non-County Highway portion) (from 87th/Boughton to Union Street)

    Short Description of Work

    The project includes pavement widening in order to provide an additional left turn lane in the northbound, eastbound, and westbound directions (since there are already single left turn lanes, they will become dual left turn lanes) and additional right turn lanes in the eastbound and westbound directions at the 87th/Boughton and Woodward intersection.  Work also includes a new traffic signal at this intersection, traffic signal modifications at the Costco entrance, storm sewer improvements, sidewalk improvements, lighting modifications, and retaining walls.

    This project is a joint effort between DuPage County and the Illinois Department of Transportation. 

    Traffic Control

  • Pre-Stage: Daytime lane closures will be used while temporary traffic signals are installed, and existing raised medians are removed and replaced with temporary pavement.
  • Stage 1: Approaching the 87th/Boughton/Woodward intersection, traffic lanes will be shifted and one thru-lane will be closed in each direction as work is performed on the north and east sides of the roads.
  • Stage 2: Approaching the 87th/Boughton/Woodward intersection, traffic lanes will be shifted and one thru-lane will remain closed in each direction as work is performed on the south and west sides of the roads.
  • Stage 3: Approaching the 87th/Boughton/Woodward intersection, traffic lanes will be shifted and one thru-lane will remain closed in each direction as work is performed on the medians.
  • Stage 4: As the roadway is milled and resurfaced, lanes will be opened to the final configuration.

  
Contract Cost
4,371,729.42

Completion Date
110 Working Days

Construction Status

Stages 1, 2, and 3 are substantially complete, with some sidewalk, fence, railing, and landscaping to be completed.

Currently, daily lane closures are being used while sidewalk and landscape restoration is completed. Work on Stage 4 is anticipated to start on April 19, 2024.

Plans, Special Provisions and Bid Details

Link to plans, special provisions, and bid details.

Function/Role Responsible Party
Contractor

Alliance Contractors, Inc.
1166 Lake Ave.
Woodstock, IL  60098
(815) 338-5900

Resident Engineer

STV, Inc.
Chicago, IL

Project Engineer

Kent Kuper, P.E.
DuPage County Division of Transportation
(630) 407-6900

Designer Engineering Resource Associates, Inc.
Warrenville, IL
Geneva Road bridge over West Branch DuPage River

Updated: Friday, May 2, 2024

Project Location(s)

County Highway 21: Geneva Road, bridge over West Branch DuPage River


Short Description of Work

The project includes removal of the existing 2-span concrete girder bridge, construction of a new single-span steel girder bridge, along with retaining walls, sidewalk and path, drainage improvements, pavement reconstruction with curb and gutter, and a stormwater storage facility.

This project is a joint effort between DuPage County and the Illinois Department of Transportation.
 

Traffic Control

  • Pre-Stage: Daytime lane closures will be used while preliminary storm sewer is installed.
  • Stage 1: Geneva Road will be closed to westbound traffic between Winfield Road and west of the bridge. The detour route includes County Farm Road, IL 38 (Roosevelt Road) and IL 59 (Neltnor Boulevard). Eastbound traffic will be reduced to one lane. The north half of the bridge will be constructed during this stage.
  • Stage 2: One lane of traffic in each direction will be open over the north half of the bridge as the south half is constructed.

Utilities

  • Aerial lines along the north side of Geneva Road will be temporarily relocated to the south side, then relocated back to the north side.
  • Two different utilities have buried lines which require relocation.

 
Contract Cost
7,867,988.00


Completion Date
145 Working Days are allowed per the contract.


Construction Status

Work is anticipated to start in May 2024.

Plans, Special Provisions and Bid Details

Link to plans, special provisions, and bid details.

Function/Role Responsible Party
Contractor

Herlihy Mid-Continent Co.
1306 Marquette Drive
Romeoville, IL 60446
(630) 378-1000

Resident Engineer

Alfred Benesch & Company
Chicago, IL

Project Engineer

Kent Kuper, P.E.
DuPage County Division of Transportation
(630) 407-6900

Designer Patrick Engineering, Inc.
Lisle, IL